Over 10 mio. titler Fri fragt ved køb over 499,- Hurtig levering Forlænget returret til 31/01/25

Reliable Maintenance Planning, Estimating, and Scheduling

  • Format
  • Bog, paperback
  • Engelsk

Beskrivelse

Written specifically for the oil and gas industry, Reliable Maintenance Planning, Estimating, and Scheduling provides maintenance managers and engineers with the tools and techniques to create a manageable maintenance program that will save money and prevent costly facility shutdowns. The ABCs of work identification, planning, prioritization, scheduling, and execution are explained. The objective is to provide the capacity to identify, select and apply maintenance interventions that assure an effective maintenance management, while maximizing equipment performance, value creation and opportune and effective decision making. The book provides a pre- and post- self-assessment that will allow for measure competency improvement. Maintenance Managers and Engineers receive an expert guide for developing detailed actions including repairs, alterations, and preventative maintenance.

Læs hele beskrivelsen
Detaljer
Størrelse og vægt
  • Vægt940 g
  • coffee cup img
    10 cm
    book img
    15,2 cm
    22,9 cm

    Findes i disse kategorier...

    Se andre, der handler om...

    Balanced scorecard Benchmarking Schedule+ Leadership Efficiency Health Scheduling Information resources Parts Safety Golden rule Specifications Patience Plant engineering Functions Performance standards Life cycle costing Planning Maintenance Life cycle Security Data integrity Perseverance planner Self-assessment FMEA Cost Center Motivate Data Migration Communicate Downtime Process mapping Empower Take responsibility Physical Asset Management Quality Factor Procedures Reliability Improvement Productivity OEE Planning and scheduling Failure modes CMO ISO 55000 Risk ranking Standard operating procedures Performance Metrics Personal Goals Proactive Maintenance Backlog Scope of work Performance benchmarking Scheduler ACE System time ranges ACE Team ACE Team Process and environmental (HSSE) Asset criticality Bathtub curves asset tracking Backlog integrity Bill of Materials benchmark jobs Asset history Asset numbering structure Breakdown maintenance Backlog Management Budget and cost control benchmark analysis sheet Backlog relief Configuration data Blanket work orders Cost Avoidance Computerized maintenance management system (CMMS) Cycle Counting Contractor management program craft performance Customer-centered Cause of failure Detailed planning Chief maintenance officer CMMS training effectiveness factor estimating CMMS benchmarking Contract maintenance Contractor management Craft utilization Critical spares Functional benchmarking Craft leader gained value Hidden resources Functional failure Deferred maintenance Default actions Defining functions direct cost savings KAHADA Labor needs Job packages Job plan database Leaders vs managers Engineering support Equipment records Labor estimates Maintenance leader Maintenance repair operations (MRO) materials management Maintenance repair operations (MRO) parts and material resources Internal benchmarking Job status codes Failure consequences Job Plans Job scope External benchmarking Failure effects Labor estimating Master Schedule Measure contractors Maintenance challenges MRO materials management Material library Overall Craft Effectiveness oce Parts kitting PAS 55 2008 Preventive maintenance (PM) Pride in Excellence Pride in Work Priority systems Online work orders Personal fatigue and delay allowance Profit ability Profit optimization Overall Equipment Effectiveness RCM Decision Diagram P-F interval Planned job packages Planner responsibilities Predictive maintenance (PdM) performance factor permits Reliable Maintenance Excellence Index (RMEI) Publicize Planner/scheduler Planner worksheet Risk-based inspection (RBI) Ready backlog Refinery work flow Job Plan Profit-centered Scoreboard for Maintenance Excellence Spare parts ownership range of time concept Shop schedule Reliability program Storeroom benefits Risk-based maintenance (RBM) Reliability-centered Maintenance (RCM) Slotting Higher throughput Spares tracking Task intervals Maintenance repair operations (MRO) Soloman auditing Schedule Breaks Schedule deviations Standing work orders Technical skill resources Team-based Top Management Support Labor library lead by example Special skills Miscellaneous allowances Strategic benchmarking Maintenance Supervisor Maintenance coordinator Maintenance excellence strategy team Maintenance manager Maintenance technical library RIME System Parts inventory master People resources Physical asset resources Planner needs Pride in Maintenance Proactive tasks Operating context Shop load plan Repetitive jobs Risk Matrix Planner skills planning times Schedule compliance Power of optimism Process Benchmarking Process Map professional goals Purchasing benefits reliable planning times Spares management Special tools and equipment Selling benefits Total backlog spread sheets Top leader
    Machine Name: SAXO080