Over 10 mio. titler Fri fragt ved køb over 499,- Hurtig levering Forlænget returret til 31/01/25

How Megaprojects Are Damaging Nigeria and How to Fix It

- A Practical Guide to Mastering Very Large Government Projects

  • Format
  • Bog, paperback
  • Engelsk

Beskrivelse

1 Introduction: The Project Abandonment Problem.

References.

2 What We Know About the Management of Very Large Projects.

2.1 Project Success Factors as Lists.

2.2 The Project Success Frameworks of Miller and Lessard and Morris and Hough.

2.2.1 Miller and Lessard (2000).

2.2.2 Morris and Hough (1987).

2.3 The Nigerian Context.

2.4 The Extended Theoretical Framework.

2.5 What About Corruption?.

References.

3 Structure of the Investigation.

3.1 Overview of the Approach Taken in This Study.

3.2 Construction and Execution of the Survey.

3.3 Construction of the Sample of Projects.

3.4 Construction of the Case Studies.

Appendix: Full Questionnaire as It Was Administered.

Our Request.

Project Variables.

References.

4 A Description of the 38 Matched Projects.

4.1 Lagos-Ibadan Express Road.

4.2 Lagos-Badagry Express Road.

4.3 Third Mainland Bridge.

4.4 Second Niger Bridge.

4.5 Egbin Power Station.

4.6 Calabar Power Station.

4.7 Zungeru Hydropower Plant.

4.8 Delta State (Oghareki) Power Plant.

4.9 Shiroro Hydroelectric Power Station.

4.10 Omoku Power Plant Station.

4.11 Mambilla Hydroelectric Power.

4.12 Ajaokuta Steel Project.

4.13 Kanji Dam.

4.14 Otukpo Dam.

4.15 Nigeria Satellite 2.

4.16 Nigeria Satellite 1.

4.17 Airtel Nigeria.

4.18 Nigerian Telecommunications Limited (NITEL).

4.19 Godswill Akpabio International Stadium.

4.20 (Samuel) Ogbemudia Stadium.

4.21 Abuja International Airport.

4.22 Lagos MMA2 Airport.

4.23 Yenagoa International Cargo Airport.

4.24 Jigawa Airport Project.

4.25 Tin Can Island Port.

4.26 Calabar Seaport.

4.27 Victoria Garden City (VGC) Housing Estate.

4.28 Festac Town Federal Housing Estate.

4.29 1004 Housing Estate.

4.30 Abuja Mass Federal Housing Project.

4.31 Olusegun Obasanjo Presidential Library.

4.32 Abuja National Library.

4.33 Nigerian Youth Empowerment Scheme (N-Power).

4.34 Nigeria Subsidy Reinvestment and Empowerment Programme (SURE-P).

4.35 Lagos State Waste Management Authority (LAWMA).

4.36 Cleaner Lagos Initiative (Visionscape).

4.37 University College Teaching Hospital (UCH) Ibadan.

4.38 University of Abuja Teaching Hospital (UATH).

References.

5 Insights from the Analysis of the Questionnaires.

5.1 Variable Distributions and Variable Capability to Detect Differences Across Projects.

5.1.1 Each Respondent Type Adds Unique Perspectives and Information.

5.1.2 The Variables Capture Robust Differences Between Abandoned and Completed Projects.

5.2 Condensing Variables into Aggregated Success Factors.

5.2.1 Approach.

5.2.2 Identifying the Factors.

5.3 Econometric Prediction of Project Completion.

5.4 Econometric Prediction of Cost and Schedule Overruns for Completed Projects.

5.4.1 Effect of Variables on Budget Overruns.

5.4.2 Effect of Variables on Schedule Overruns.

5.5 The Corrosive Effect of Corruption.

Appendix 1 Correlations Among Independent Variables Across All 114 Responses.

Appendix 2 Factor Analysis.

Appendix 3 Specification of the Logistical Regression.

Appendix 4 The Logistical Completion Probability Regression by Respondent Group.

Appendix 5 Robustness Analysis: Cost Overrun Regressions by Respondent Group.

Appendix 6 Robustness Analysis: Schedule Overrun Regressions by Respondent Group.

6 Two Library Projects.

6.1 The National Library of Nigeria in Abuja: An Abandoned Project.

6.1.1 Project Initiation.

6.1.2 Contract Signature and Execution.

Læs hele beskrivelsen
Detaljer
Størrelse og vægt
  • Vægt400 g
  • Dybde1,4 cm
  • coffee cup img
    10 cm
    book img
    15,5 cm
    23,5 cm

    Findes i disse kategorier...

    Se andre, der handler om...

    Machine Name: SAXO083